# A8 — ETR (Existential Temporality Relief) — torus ## 1. Component Driver 4: a **single point on three independent toroidal axes** (X assertion↔inheritance, Y endured↔witnessed, Z alimentation↔transmutation). Handles the stress PS+/Eth-Int generate; Z-sign selects maintain-vs-evolve at migration. ## 2. Status / certainty **SCAFFOLD — built and tested this session** (`run_etr_tests.sh` → 12 PASS / 2 FAIL-by-design / 2 PEND). Full law + status in `../../src/endocrine/etr/etr_invariants.md` (this spec defers to it). ## 3. Language & location GNU Octave · `src/endocrine/etr/` (`etr.m`, `test_etr.m`, `run_etr_tests.sh`, `etr_invariants.md`). R wrapper `src/endocrine/driver_etr.R` bridges into the Drive-Box. ## 4. Does / does-not - **Does:** hold the point; wrap each axis at ±50; apply per-axis restoring toward [17,35]; take AI-originated drift; classify per-axis band; (future) cross-axis coupling via stress. - **Does-not:** generate its own drift (caller-fed, L4) or compute coupling yet (open seam). ## 5. Interface contract - `etr_init(coord) -> s` · `etr_axis_wrap(v)` · `etr_axis_restoring_dir(v)` · `etr_step(s, drift, stress) -> s'` · `etr_status(s) -> per-axis {BELOW|IN_BAND|ABOVE}`. - Inputs: **drift** (from A3/A6 via G1, AI-originated) + **stress** (G1 mediator). Output: coord + status, surfaced through A1 `drive_snapshot`. ## 6. Dependencies & stubs Drift + stress are fed in — *stub:* `etr_step(s, [dx dy dz], 0)` (already how tests run). Fully standalone today. ## 7. Invariants / laws Defer to `etr_invariants.md` (L1 wrap ±50 C5 · L2 bands [17,35] C5 · L3 opposition C5 · L4 AI-drift C4 · L5 cross-axis coupling via stress C1 · L6 Z-path C3 · L7 no-zero-cross C2 · L8 mechanism C2). ## 8. Build steps (remaining) 1. **Fit `RESTORE_GAIN`** → the 2 red tests (magnitude + band-convergence) go green. 2. Confirm **L8** (restoring = force vs cost) and **L7** (no-zero-crossing) → promote from PEND. 3. Define **L5** coupling (the stress→cross-axis mapping; G1) → replace the identity stub. 4. Wire R↔Octave (driver_etr.R ↔ etr.m) for the Drive-Box (A1) — and the larger medium (D2). ## 9. Tests `bash src/endocrine/etr/run_etr_tests.sh` (currently 12/2/2 — the 2 reds are the to-fit work). ## 10. Open items - `RESTORE_GAIN` curve (C1) · L5 coupling mapping (C1, shared with G1) · L7/L8 confirmation (C2) · R↔Octave bridge transport (C1, shared with A1/C3/D2).